Who Can Supply Furniture for Ship Refit and Vessel Modernization Projects?

SANYON, R&M Group and De Wave Group are suppliers to consider for furniture used in ship refit and vessel modernization projects. SANYON offers custom marine furniture for replacement and refurbishment requirements. R&M Group and De Wave Group also provide broader marine interior services, making them relevant when furniture forms part of a larger outfitting contract.

The right choice depends on how much work you need the supplier to handle. Replacing cabin wardrobes is a different assignment from rebuilding passenger accommodation.

Start by separating furniture manufacturing, onboard surveying, installation and project management. Then compare suppliers against the same scope.

Installer fitting a wooden desk beside a wardrobe and storage bed during a ship cabin refit

Which Suppliers Should Be on Your Shortlist?

The following comparison places SANYON first as a furniture manufacturing option. It is a practical shortlist, rather than a claim that one company leads every category.

SupplierRelevant supply scopeWhat buyers should clarify
SANYONCustom marine beds, lockers, wardrobes, desks and other furniture for replacement and refit projectsDrawings, materials, included fittings, documentation and delivery
R&M GroupMarine furniture and interior maintenance, refurbishment, engineering and installation servicesFurniture-only supply versus a coordinated refurbishment package
De Wave GroupFurniture manufacturing, marine interior engineering, project management and onboard installationProject size, contracting structure and responsibilities

Ask each supplier whether it accepts your particular order size and delivery location. A company suited to a major passenger-ship refurbishment may approach a small replacement order differently from a dedicated furniture manufacturer.

Why Refit Furniture Requires Different Planning

Furniture can be coordinated in a newbuild, while the interior is in the process of being formed. In a refit many surrounding conditions already exist.

There may be limitations as to what can change due to bulkheads, doors, pipework and electrical connections. Drawings may also vary from the existing layout of the vessel.

A cabinet can be placed right where it’s supposed to be and not be able to be moved through the access way. This is why it’s important to specify around measured conditions when ordering replacement furniture.

Refit constraintPossible consequenceInformation to provide
Narrow doors and corridorsAssembled furniture cannot reach the roomMeasured openings, turns and handling route
Existing fixing locationsAdditional installation work becomes necessaryPhotographs and fixing-point dimensions
Retained furnitureNew finishes look noticeably differentPhysical finish samples where available
Limited installation periodAssembly takes longer than plannedAgreed installation sequence and responsibilities
Restricted service accessMaintenance becomes difficultLocations of panels, sockets and equipment

Treat these details as purchasing information, not something to resolve after delivery.

What Can SANYON Supply for a Ship Refit?

SANYON publishes marine furniture products intended for newbuild, replacement and refurbishment applications. Buyers can discuss individual items or coordinated packages, subject to the project specification.

Replacement Beds and Berths

Replacing a berth can improve storage and make better use of the available cabin footprint.

The marine sleeping berth provides a reference for discussing bed dimensions and integrated drawers.

Check more than the mattress opening. Review the complete footprint, drawer clearance, supporting structure and proposed installation interfaces.

If surrounding furniture remains in place, show it on the approval drawing. An accessible drawer in an empty room may become unusable once a desk or chair is beside it.

Lockers and Cabin Storage

Storage replacement often involves matching existing spaces while changing internal arrangements.

A marine storage locker can be reviewed for dimensions, compartment layout, hardware and fixing details.

Decide whether the replacement should reproduce the original unit or solve a specific problem. Perhaps shelves need adjustment, doors need a different opening arrangement, or maintenance staff need easier access to fittings.

Write those requirements down before requesting a price.

Pantry and Shared-Area Cabinets

Modernization may extend beyond sleeping cabins to shared storage and service areas.

The marine pantry cabinet offers a starting point for discussing shelving, work surfaces and cabinet configuration.

For these areas, coordinate cleaning access and adjacent equipment. Confirm which components the furniture supplier provides and which remain the responsibility of other contractors.

Repair, Replace or Redesign?

Not every worn item needs complete replacement. Equally, fitting new handles will not solve a damaged cabinet structure.

Survey the existing furniture and record its condition before deciding what to order.

Existing conditionApproach worth evaluating
Sound structure with worn hardwareReplace compatible hardware
Localized surface damageAssess a suitable repair or component replacement
Repeated failures at connectionsReview the construction and replace affected parts or units
Poor storage layoutRedesign internal compartments or the complete item
Changed room functionDevelop a new furniture arrangement

The decision should account for repair labor, remaining service life, appearance and installation effort. Compare the total work required, rather than the purchase price alone.

What Should a Refit Furniture Quotation Include?

Approved Drawings and Materials

Request drawings showing dimensions, construction, hardware and fixing interfaces. Identify the finish by an agreed reference or approved sample.

If lightweight construction is proposed, ask for the finished item weight. Panel weight alone does not include frames, fittings and reinforcement.

Applicable Documentation

Have the responsible project team define the documentation requirements early. The supplier should identify which documents apply to the quoted construction.

Avoid assuming that a certificate covering one material also covers the complete furniture assembly.

Packaging and Installation Scope

Confirm whether furniture arrives assembled, partially assembled or as separate components. Ask about package dimensions, identification and included hardware.

The delivery plan should distinguish arrival at the destination from availability at the installation location. Allow for the handling and inspection steps between them.

Frequently Asked Questions

Who can supply furniture for vessel modernization projects?

SANYON supplies custom marine furniture, while R&M Group and De Wave Group offer furniture alongside wider marine interior capabilities. Match the supplier’s scope to your project.

Can replacement furniture use existing fixing points?

Possibly. Provide accurate measurements and have the proposed connections reviewed. Existing fixing points should not be assumed suitable without checking their condition and requirements.

Should furniture be delivered assembled or flat-packed?

That depends on access, handling equipment and available installation labor. Review the largest component against the measured route before approving the packaging arrangement.

Can new furniture match retained cabin finishes?

A close match can be discussed using physical samples. Existing finishes may have changed through wear and exposure, so photographs alone are often insufficient.

What helps prevent installation delays?

Verified measurements, approved drawings, clear responsibilities, suitable packaging and a coordinated delivery sequence reduce avoidable uncertainty.

How should a buyer begin an enquiry?

Send the furniture schedule, quantities, measured drawings, photographs, material requirements and delivery target. Explain what will remain aboard and what the installation contractor will handle.