Procurement of ship refit furniture includes a survey of existing furniture, furniture to be replaced, authorising and approving construction details, co-ordinating with the refit schedule. The objective is to provide ‘furniture in the vessel’ which serves the needs of the vessel’s everyday use and can be fitted within the working time available.
The shopping list for a replacement wardrobe may seem simple at first glance. Outside, however, the existing service panels, the condition of the deck and the doorway can alter the job on the go board.
Good preparation begins before the shipowner asks for a quotation to shipyards and marine outfitters.

Begin With a Furniture Condition Survey
Observe the impacted areas and document the things that need to be addressed. Identify worn surfaces and identify damaged structures or layouts that are not suitable.
If the cabinet is constructed well, it might require nothing more than compatible replacement parts. If a bed has repeated connection failures in it there should be a closer look at its structure.
Take a picture of each object, label it with a reference number and indicate if there is any surrounding furniture to be retained.
| Existing condition | Procurement approach to evaluate |
|---|---|
| Worn handles or drawer runners | Replace compatible components |
| Local surface damage | Assess repair or individual panel replacement |
| Damaged frame or connections | Review construction and consider replacement |
| Inadequate storage | Redesign compartments or the complete unit |
| Changed cabin function | Develop a revised furniture arrangement |
Include maintenance staff in this survey. They often know which drawers jam, which fittings repeatedly loosen and which areas are difficult to clean.
Measure the Room and the Delivery Route
Use existing drawings as a reference but double check dimensioning that would impact manufacture and installation.
Take the dimensions of the furniture, room height, clearances and fixing points around the furniture. Record obstructions such as skirting, pipe enclosures and access panels.
Next, measure the passage into the room.
Sometimes the replacement cabinet can fit in its destination, but be too big to be turned through a corridor. For limited access, consider talking with the supplier about individual components or part assembly.
The marine sleeping berth is a starting point for examining dimensions and integrated storage for sleeping areas. Check drawer movement against the complete cabin layout.
Prepare a Furniture Schedule Suppliers Can Quote
Give every supplier the same information. This makes commercial comparisons more useful and reduces hidden assumptions.
A schedule should connect each item to a drawing, quantity, finish and installation location.
| Schedule field | Information to include |
|---|---|
| Item reference | Unique code used across drawings and packaging |
| Location | Vessel area, deck and cabin type |
| Quantity | Required units and any agreed spares |
| Dimensions | Overall size and critical clearances |
| Construction | Materials, surfaces, edges and hardware |
| Installation | Interfaces, brackets and assembly requirements |
| Delivery | Required location and installation sequence |
Mark uncertain details clearly. If two material options are being considered, request separate proposals with their differences explained.
Select Furniture Around Renovation Priorities
Beds and Berths
Decide whether the replacement must reproduce the existing arrangement or improve storage and access.
Confirm mattress dimensions, overall footprint, supporting structure and supplied fittings. For bunk arrangements, have the responsible project team review access, guarding and clearances.
Avoid increasing storage at the expense of usable cabin space.
Wardrobes and Lockers
Start with the belongings occupants need to store. Review hanging space, shelves, locks and door movement.
A marine storage locker can be discussed as a replacement reference, with dimensions and configuration confirmed for the actual location.
Clarify the purpose of each locking or retention feature. Securing personal belongings and keeping a door closed during vessel movement are separate requirements.
Shared-Area Cabinets
Pantries, lounges and offices may need changes alongside cabin renovation.
For a marine pantry cabinet, coordinate shelf arrangements, work surfaces, cleaning access and adjacent equipment.
Identify service openings that must remain accessible after installation.
Compare Construction and Documentation
Use detailed furniture assembly terms instead of general terms like “marine grade.”
If the object is made of metal, check material, thickness, joint and surface treatment. In the case of panel furnishing, verify the substrate, decorative surface, edges and hardware attachment.
If the supplier suggests a lighter construction, ask for the completed item weight and any accompanying information.
Set by responsible project team the required documentations. Ensure that supplier provides evidence for proposed materials or assemblies, and consider substitutions prior to production.
Choose a Supplier With a Clear Refit Scope
SANYON can be evaluated as a supplier for custom marine furniture replacement, such as beds, lockers and cabinets. It has been published to include products for refurbishment applications.
The enquiry should still clarify what the supplier will take care of.
Who verifies measurements? What people prepare drawings for production? Who supplies the mounting hardware? Who does the furniture installation?
Write those tasks in the order. The furniture manufacturer and on board installation contractor can be distinct.
Build the Programme Backward From Installation
Start with the date the installation team needs the furniture, then work backward through receiving, transport, inspection, production and approvals.
Do not treat factory completion as the final delivery milestone.
| Stage | Decision or confirmation needed |
|---|---|
| Survey | Verified dimensions and replacement scope |
| Technical review | Approved construction, finishes and interfaces |
| Sample review | Acceptance of representative items where needed |
| Production release | Confirmed quantities and drawing revisions |
| Inspection | Agreed checks and resolution of discrepancies |
| Delivery | Packaging, handling and installation sequence |
For phased renovations, discuss whether deliveries can follow the work sequence. Package identification should help the crew locate items without unpacking the entire shipment.
Frequently Asked Questions
What is ship refit furniture?
It is furniture purchased or modified for an existing vessel during renovation, refurbishment or modernization.
Should existing furniture always be replaced?
No. Assess its condition, repair effort and suitability first. Some items may remain serviceable with component replacement.
Can replacement furniture match existing dimensions?
Custom manufacturing can be discussed using verified measurements. Include surrounding clearances and the onboard access route.
Can new finishes match retained furniture?
A close match may be possible, but existing surfaces can change with age and exposure. Compare physical samples where practical.
Is assembled furniture easier to install?
It can reduce assembly work, but handling and access may become harder. Compare both arrangements against the vessel’s conditions.
Should buyers approve a sample?
A sample is useful for repeated items or unfamiliar construction. Agree what it must demonstrate before ordering.
What should the quotation include?
Require clear materials, quantities, drawings, fittings, documentation, packaging, delivery terms and exclusions.
How can future repairs be simplified?
Retain approved drawings, item references, hardware details and finish samples. These records help maintenance teams identify compatible replacements.